Copyright 2001-2010 Modular Concrete Docks LLC. All Rights Reserved.
No information on this site, may be duplicated without the expressed written permission of Modular Concrete Docks LLC.
2 Allen Road • Eldon, MO 65026 • PHONE: (573) 365-9059 • FAX: (573) 365-1115
One of our well qualified technical sales staff members will be assigned to your project and will fill out and submit the necessary forms to Ameren UE, F.E.R.C., Water Patrol, if necessary the U.S. Army Corps of Engineers or any other entity deemed necessary.
Modular Concrete Docks will also assign a project manager & project engineer to provide a complete site analysis and color overhead site plan combining GIS and AutoCAD.
Modular Concrete Docks only asks that the necessary fees (Permit Cost and Usage Fees) be paid by the customers. We will manage all: paperwork, filings, and follow ups, at no cost.
A Sample of the forms Necessary for permit submission to Ameren UE.
A sample of our computerized color AutoCAD Drawings with the actual dock to the right and the overhead site plan below.
Click On Our Resource Links Below:
Concrete Encapsulated Foam
Built Stronger, Lasts Longer
Manufacturers of